Assemble, Construction & Installation | Customer |
---|---|
Installation of 40 TPH Bio-mass Boiler, Steam Turbine and Steam Piping for HK Bower Sdn Bhd at Gua Musang. | Advance Boiler Sdn Bhd |
Installation of 1 unit 8 T/HR Atlas Combi Boiler in Penang. | Advance Boiler Sdn Bhd |
Inspection, Overhaul, dynamic balancing and laser alignment of FD & ID fans. | A1 Glove Sdn Bhd |
Assemble and installation of 6 units of self- standing Chimney 120 feet. | NSE Resources Corporation (M) Sdn Bhd |
2 units of Thermal Deaerator and Structure Installation at B-400, BASF Petronas. | NSE Resources Corporation (M) Sdn Bhd |
Boiler Retubing & Repair | Customer |
---|---|
Installation of 40 TPH Bio-mass Boiler, Steam Turbine and Steam Piping for HK Bower Sdn Bhd at Gua Musang. | Advance Boiler Sdn Bhd |
Installation of 1 unit 8 T/HR Atlas Combi Boiler in Penang. | Advance Boiler Sdn Bhd |
Inspection, Overhaul, dynamic balancing and laser alignment of FD & ID fans. | A1 Glove Sdn Bhd |
Assemble and installation of 6 units of self- standing Chimney 120 feet. | NSE Resources Corporation (M) Sdn Bhd |
2 units of Thermal Deaerator and Structure Installation at B-400, BASF Petronas. | NSE Resources Corporation (M) Sdn Bhd |
Retubing 107 Length 3 inch Diameter Enco Boiler 11. | NSE Energy Sdn Bhd |